A Bathroom Built for the Next Fifty Years

Before We Touched a Wall

Gary is an architect. So when he told us he suspected hidden water damage beneath the tub, we didn't guess, we verified. Before demolition, we crawled beneath the house, pressure-tested the plumbing, inspected the framing, and confirmed what years of slow leakage had been doing behind the scenes. We also uncovered another challenge: the HVAC system sat directly in the path of the plumbing work. Understanding the house before changing it meant we could solve the real problems, not just replace the finishes.

Before construction began, we pressure-tested:

• Existing plumbing system

• Framing beneath the tub and shower

• Evidence of hidden water damage

• HVAC conflicts before demolition

PROJECT TYPE
FULL HOME REMODEL
LOCATION:
Central Oregon (Bend)
PRICE:
$650,000
YEAR:
2026
PROJECT TYPE
BATHROOM REMODEL
LOCATION:
Central Oregon (Bend)
PRICE:
$130,000
YEAR:
2025

The Homeowner's Challenge

Hidden Problems Behind a Dated Bathroom

The room wasn't simply outdated, it was working against the homeowners.

  • The oversized platform tub created an everyday fall hazard.

  • Cracked tile hinted at moisture problems underneath.

  • Years of slow plumbing leaks had begun damaging the framing below.

And despite its size, the bathroom somehow felt smaller than it actually was. Gary and Amy weren't looking for luxury for luxury's sake.

They wanted a bathroom they could comfortably enjoy for decades.

Before the Transformation

Oversized platform tub

Oversized platform tub

Cracked tile and aging finishes

Cracked tile and aging finishes

Hidden water damage below

Hidden water damage below

Wasted square footage

Wasted square footage

Our Approach

Walk the Space and Listen

Most homeowners know something is wrong before they can name it. Gary could name it. As an architect, he already understood the home's challenges, allowing us to focus on thoughtful planning instead of explaining the basics.

Test Before You Guess

Gary suspected there was hidden water damage. Instead of assuming he was right—or wrong—we verified it before demolition. That decision uncovered more than just a plumbing issue.

The Crawl Space Wasn't Going to Move Itself

The plumbing couldn't be repaired from above. To do the job correctly, we had to work beneath the house—but the HVAC system was standing directly in the way.

Schluter: The Detail That Separates Good from Done Right

A Schluter shower system looks effortless when it's finished. Getting there takes careful planning, precise installation, and attention to details that disappear once the tile is in place.

A Layout That Makes Sense

The original layout wasted valuable space. By rethinking the room from the ground up, we created a bathroom that feels larger, functions better, and is ready for the years ahead.

If You Can't Buy It, Build It

Some spaces deserve more than an off-the-shelf solution. The custom vanity was designed and built in-house to fit the room perfectly while complementing the home's mid-century modern character.

The Design Details

Custom Rift-Sawn White Oak Vanity

Designed and built in-house to fit the room perfectly.

Why it matters: Natural materials age gracefully and eliminate the compromises of standard cabinetry.

Spa-Inspired Shower Room

Slot drain, river rock floor, glass divider, illuminated niches.

Why it matters: The shower becomes the centerpiece while remaining accessible and easy to maintain.

Bamboo-Inspired Tile

Natural textures paired with skylight lighting.

Why it matters: The space feels warm instead of sterile.

Schluter Waterproofing System

Professional waterproofing beneath every finished surface.

Why it matters: Great tile work begins with what homeowners never see.

The Final Transformation

A Bathroom Worth the Wait

Amy started calling it her "Lavish Loo" before the project was even finished.

The name stuck, not because the bathroom feels extravagant, but because it became exactly what they hoped it would be.

The fall risk is gone. The hidden rot is gone. The wasted square footage is gone.

In its place is a spa-inspired primary bathroom that feels perfectly at home in a mid-century modern house that had been waiting nearly fifty years for this transformation. Every detail was thoughtfully planned, carefully built, and designed to serve Gary and Amy for decades to come.

When Gary saw the finished space, he summed it up best:

"I can't believe how Branch Brothers brought my vision to life. It is exactly how I pictured it when I drew the plans."

After Gallery

Why ChooseBranch Brothers Construction?

With over two decades of experience, our team combines expert craftsmanship with personalized service. Whether it’s a full remodel or a small upgrade, we’re here to create spaces that reflect your vision and enhance your home.

Building the Future, Restoring the Past since 2009

Social

Newsletter